Restart
陈燕
-
0
留言 -
917
浏览
Japan’s largest cracker operator Mitsubishi Chemical restarted its cracker in Mizushima on Monday after a two-week shutdown.
The 450,000 ton/year cracker in Okayama prefecture was shut on 30 December for an unplanned inspection and decided to repair part of the unit.
相关商品帖子
-
A 山东经鑫化工溶剂18253310588 2024-11-22
-
张静 2024-11-19
-
牛经理 2024-11-18
-
惠经理 2024-11-13
-
张静 2024-11-09
商品其他帖子
更多
-
18899874482 2022-08-12
-
南京中炼能源有限公司 2022-05-13
-
陈经理 2019-12-17
-
小崔 2019-01-31
-
小崔 2018-12-27
-
小崔 2018-11-15
-
小崔 2018-09-20
-
小崔 2018-07-19